elapsed duration meaning in Chinese
占用的工期
Examples
- For example , use elapsed duration to indicate the time required for a painted wall to dry .
譬如,可以使用24小时制工期指定粉刷后墙壁所需的干燥时间。 - To specify elapsed duration , precede the time unit with the letter " e " ( for example , edays for elapsed days )
要指定24小时制工期,请使用时间单位“天”而不是“工作日” 。 - Using elapsed duration , a 4 - day task that begins on a thursday will occur on thursday , friday , saturday , and sunday
使用24小时制工期后,从星期四开始为期四天的任务将发生在星期四、星期五、星期六和星期日。 - If you want to schedule a task over a continuous period of time , including nonworking time , you can specify an elapsed duration
如果要在连续的时间内排定任务,其中包括非工作时间,则可以指定“ 24小时制工期” 。 - If the wall was painted on friday and it took 2 days to dry , the elapsed duration would span 3 days , beginning on friday and ending on sunday
如果在星期五粉刷墙壁,且需要两天时间干燥,则24小时制工期为三天,从星期五开始,在星期日结束。